PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Curtain wall framing at the 2nd floor South Elevation.jpg Installed electrical panel board at the 2nd floor Room 221 Facing North.jpg Installed temporary tarps at the 1st floor Facing South.jpg Installing sanitary-waster piping at bathrooms 242-243 Facing South.jpg Metal Furring at the 2nd floor Shear wall Elev. 1,2,3 Facing East.jpg Preping for the Attoneys  Facing North.jpg Started installing the Curtain wall mullions at the South Elevation.jpg UCIA Roof drains-storm piping Facing South.jpg Aligning stone panels at the South Elevation.jpg
Previous pageNext page Metal Furring at the 2nd floor Shear wall Elev. 1,2,3 Facing East
Metal Furring at the 2nd floor Shear wall Elev. 1,2,3 Facing East